Packer
- Company Name:Samwon Tuksu Co., Ltd.
- Membership:Free Member
- Member Since:2003. 03.22
- Country/Region:Korea
- City:Daejeon
- Contact:Eunja Kim
- Related Keywords:Packer, Grouting Accessory
Contact us
Samwon Tuksu Co., Ltd.
[Korea]
Packer
Overview
Patented construction method preventing water-tight layer form destruction mainly because of cracks or its swelling/coming off as expansion matters such as moisture generated form layers under the water-tight layer, which is exposed and directly affected by temperature are emitted.

A Method of Construction for Injection
![]() |
1. Crack and leakage condition inspection Check the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure |
![]() |
2. Drilling Operation Drill directly into crack section if the thickness of concrete is thinner than 10cm. For the thickness of 10cm ~ 50cm, drill it with 45 degree angle by keeping a distance of 1/5 of concrete thickness. Make sure it penetrates the crack section. If the thickness is over than 50cm, keep the distance of 20cm ~ 30cm and drill it with 45 degree angle until it penetrates crack section. And keep drilling by maintaining the fixed interval. (5 holes per 1 meter. Drill it in zigzags) |
![]() |
3. Packer Installation Clean the inside of drilled holes with compressor. Make sure that rubber sleeve of packer and cutting line of tightening nut should be put into the inside of concrete surface when installing. Tighten the packer completely by using the T-box. (Packer might be damaged if you tighten it too strongly) |
![]() |
4. Injection Operation Inject the urethane water stopping material by using the high pressure device or grease gun. Maintain the initial injection pressure as around 40kg/cm and increase the pressure by each 10kg/cm gradually until the water stopping material flows out from crack section. Water will come out from the crack section first and then water stopping foaming agent and then water stopping liquid at last. If the water stopping material that is not foamed comes from the crack section, then move to next packer for injection. |
![]() |
5. Packer Removing Operation Remove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again. |
![]() |
6. Finishing Operation Remove the water stopping material that is remained on the crack section. Spreading with the elastic sealing material. |
Other products from this supplier
Related products from premium suppliers on EC21
Browse: Manufacturer Directory Premium Suppliers Site Map
About EC21 Contact Us Terms & Conditions Report Item Online Trading Risks Product Listing Policy
Copyright (c)1997-2026 EC21 Inc. All Rights Reserved. EC21 in KoreanChinese
Business Registry Number: 120-86-03931 | Mall order sales Registration Number: 강남-5838